Fitness Center – Chicago, IL
Introduction
Mintropy’s input into this project was as a construction administration outfit dealing with the creation of a 32,000 Sq. Ft. fitness center and UFC arena. The client’s location for the construction of their fitness center was on the 2nd floor of an existing mixed-use building in Chicago’s Wrigleyville neighborhood. The new fitness center required clever work to ensure that the available space was well-utilized. Mintropy’s input as the construction administration professionals fell into two major categories:
Mechanical
Heating and cooling solutions for the fitness center relied on our trained engineers. Our staff monitored the cooling capacity of the building and made adjustments to the HVAC system if necessary. Additionally, we dealt with heat exchange within the transformer room, verifying the new heat-load for the local electrical system.
Electrical:
Our engineers worked alongside our client to provide backup feeder solutions serving the UFC space. We also inspected the location to determine the best place for the new transformer. Emergency breakers and the type and size of wiring were part of our design specifications, to ensure safety and maintain a constant supply to the fitness center. Planning a construction project like this requires an understanding of more than just basic construction principles.
Key Features
- 45 kVA Emergency System
- 22 Water source heat pumps
- 1 Energy recovery ventilator
Roles
- Fitness Center / Gym design
- Emergency System design (as per C2 Occupancy)
- Outside Air Energy Recovery design
- Water source Heat pump design
- Construction Administration
- Variable Speed Drive Fan design
- Multiple showering facility design
Summary
This project required significant amounts of planning and research, as well as follow-up. Permit approvals are a delicate business, but Mintropy’s personnel are well-versed in the application process and managed to guide our clients efficiently through the red tape. We dealt with the permit application process and the online forms required, keeping things simple for our client throughout the process.
Others project
Pittsburgh International Airport – Pittsburgh, PA Bad Egg Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Convive Coffee Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Stack + Press Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Mi Casa Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Bad Egg Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Convive Coffee Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Stack + Press Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…
Pittsburgh International Airport – Pittsburgh, PA Mi Casa Restaurant
Introduction Mintropy, LLC was engaged to provide Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) engineering…