Bradley Dispensary

Introduction

The BRADLEY DISPENSARY renovation project was a complex and challenging project that required the expertise of Mintropy MEP Company. The project involved the conversion of an existing grocery space into a cannabis dispensary. The project area was 8300 sq feet.

One of the main challenges of the project was the need to include special considerations for ventilation and humidity requirements. These requirements are essential for the safe and legal operation of a cannabis dispensary, and it was crucial that they were met in order for the dispensary to be able to open its doors to the public.

1. the mechanical scope:

The BRADLEY DISPENSARY renovation project required an extensive mechanical overhaul to ensure that the facility would meet all necessary ventilation and humidity requirements. To accomplish this, the mechanical scope of the project involved installing a brand-new rooftop unit that would provide the necessary air exchange and climate control. Additionally, a new ductwork distribution system was implemented to ensure that the air would be properly circulated throughout the dispensary. Furthermore, new toilet exhaust and distribution, as well as new general exhaust and distribution, were installed to ensure that the dispensary would be able to maintain the proper levels of humidity and air quality. To maximize the control over the climate control system, local controls were also included in the mechanical scope of the project. Lastly, a new gas distribution system was implemented to ensure that the dispensary would have access to the necessary utilities.

2. the electrical scope:

The electrical scope of the project was also critical in ensuring that the dispensary would be up to code and able to meet all safety requirements. To accomplish this, new electrical power outlets and circuiting were installed throughout the facility, along with emergency battery units. Additionally, a fire detection and alarm system were installed and fire alarm speakers/strobes were also included to ensure that the facility would be able to meet all necessary fire safety requirements

3. the plumbing scope:

The plumbing scope of the project was also an essential aspect of the renovation. A complete sanitary drainage and vent system, as well as a complete domestic water (cold and hot) system, were installed to ensure that the dispensary would be able to meet all necessary plumbing requirements. Riser diagrams were also created to ensure that the plumbing system would be properly configured and a re-circulation system was implemented to conserve water. Additionally, plumbing fixture specifications were also included in the plumbing scope to ensure that the dispensary would have access to the necessary fixtures.

key features

  • Mechanical scope includes: new rooftop unit, new ductwork distribution, new toilet and general exhaust systems, local controls, and new gas distribution.
  • Electrical scope includes: new electrical power outlets and circuiting, emergency battery units, fire detection and alarm system, and fire alarm speakers/strobe.
  • Plumbing scope includes: complete sanitary drainage and vent system, complete domestic water system, riser diagrams, re-circulation system, and plumbing fixture specifications.
  • The project provided mechanical, electrical and plumbing engineering services for permit and construction engineering documents.
  • The renovated facility is located at 1300 Locke Dr, with a floor space of approximately 8,300 sq ft for a cannabis dispensary.

roles

  • Overall management of the project
  • Day-to-day site operations
  • Design and planning of the project
  • Technical expertise (structural, mechanical, electrical, plumbing)
  • Construction and subcontractor management
  • Specialized expertise (environmental impact, cost estimating, etc.)
  • Initiates and funds the project
  • Responsible for specific tasks (procurement, document management, safety, quality control, etc.)

summary

Overall, Mintropy MEP Company was able to successfully complete the BRADLEY DISPENSARY renovation project, meeting all of the necessary requirements for the safe and legal operation of a cannabis dispensary. The end result was a beautifully transformed space that was able to meet the needs of the cannabis dispensary market. The project was completed on time and within budget.

Existing

Type

8300 Sq.Feet

Area

Retail

Market

Bradley IL

Location

Others project

Mintropy Blog Thumbnail

Denver Cole – Eatontown NJ

Introduction: Mintropy undertook MEP Design Services for the interior buildout of approximately 20,000 Sq. ft….

View Project
Mintropy Blog Thumbnail

Cultivation Facility – West Haven CT

Introduction: Mintropy undertook MEP Design Services for the interior buildout of an existing warehouse space….

View Project
Golfzon Chicago

Golfzon Chicago

Mintropy MEP Company was contracted to provide mechanical, electrical, and plumbing engineering services for the

View Project
Peoria Ob Gyn

Peoria, Ob/Gyn Facility

Mintropy, LLC was tasked with providing mechanical, electrical, and plumbing engineering services for the renovation

View Project

Looking for innovative and reliable solutions? We can help.

We provide value-driven services & client-focused solutions.