Pet Supplies Plus – Oro Valley, AZ
Introduction
This project aimed to overhaul the existing MEP systems for a 9,500 Sq. Ft. Pet Plus Supplies store. The HVAC redesign prioritizes optimal air quality with zoning and moisture control. The electrical scope focuses on safety and energy efficiency, integrating LED lighting and smart controls. Plumbing caters to efficient pet-wash stations and aquarium setups, emphasizing water conservation and aquatic pet well-being.
Others project
Center for Green Technology – Chicago, IL
The Center for Green Technology renovation project was a challenging but successful undertaking for Mintropy
Introduction This project involved an existing 28-story high-rise building with a complex plant system. The
This massive, 310,000 square-foot, multi-story residential building with an underground parking area is one of
Introduction Mintropy, LLC was engaged to provide mechanical and plumbing engineering services for the renovation…
Center for Green Technology – Chicago, IL
The Center for Green Technology renovation project was a challenging but successful undertaking for Mintropy
Introduction This project involved an existing 28-story high-rise building with a complex plant system. The
This massive, 310,000 square-foot, multi-story residential building with an underground parking area is one of
Introduction Mintropy, LLC was engaged to provide mechanical and plumbing engineering services for the renovation…